ABSTRACT

Congressional Budget Office Cost Estimate: H.R. 2641, Pacific Northwest Pumped Storage Hydropower Development Act of 2021   [open pdf - 163KB]

This is the Congressional Budget Office (CBO) Cost Estimate as ordered reported by the House Committee on Natural Resources on May 26, 2021. From the Document: "Under current law, nonfederal entities that propose to develop hydropower at reservoirs administered by the Bureau of Reclamation (BOR) must enter into a lease with BOR or obtain a license from the Federal Energy Regulatory Commission (FERC). The regulatory jurisdiction of each BOR reservoir was previously negotiated by the agencies to clarify which permitting process would be in effect for each reservoir. At least one project, a proposal to develop pumped storage hydropower within BOR's Colombia Basin Project (CBP) in the state of Washington, would need permits from both agencies because it would be constructed on two reservoirs; Banks Lake would require a BOR lease and Lake Roosevelt reservoir would require a FERC license. (Pumped storage hydropower is a type of storage for hydroelectric energy used by electric power systems for load balancing.) H.R. 2641 would make BOR the sole regulatory authority for developers seeking a lease for a pumped storage hydropower facility at federal reservoirs. The bill also would require the nonfederal developer to negotiate an agreement with the Confederated Tribes of the Colville Reservation and the Spokane Tribe of Indians of the Spokane Reservation as a condition for a BOR lease on CBP facilities."

Publisher:
Date:
2021-07-26
Copyright:
Public Domain
Retrieved From:
Congressional Budget Office: http://www.cbo.gov/
Format:
pdf
Media Type:
application/pdf
URL:
Help with citations