Chemical Weapons: Stockpile Destruction Delayed at the Army's Prototype Disposal Facility   [open pdf - 2MB]

"GAO found that: (1) the Army's effort to expand and test the Johnston Atoll Chemical Agent Disposal System (JACADS) delayed its operations; (2) full-scale operations at JACADS slipped another 9.5 months because of technical and contractor staffing problems during the program's operations and maintenance phase; (3) continuing technical problems could result in further slippage in the JACADS schedule; (4) the Army's estimated total costs for JACADS have increased $190 million and will likely continue to grow; (5) the Army has developed a program for implementing design changes to the follow-on stateside chemical disposal facilities based on the technical problems encountered at JACADS; (6) the Army has taken actions to improve the contractor's performance and its own oversight of the operations and maintenance contract; (7) Army officials said that the operations and maintenance contract did not include adequate provisions for the Army to ensure that contractor overtime was necessary; (8) the Army plans to incorporate lessons learned from operations verification testing at JACADS into the design of future U.S. disposal plants; (9) JACADS schedule delays caused construction start-up delays at three other planned facilities; and (10) because of delays in JACADS operational verification testing schedules, additional munition storage time is needed and will increase storage costs to an estimated $33 million."

Report Number:
GAO/NSIAD-90-222
Publisher:
Date:
1990-07-30
Copyright:
Public Domain
Retrieved From:
Lessons Learned Information Sharing (LLIS); U.S. Government Accountability Office: http://www.gao.gov/products/NSIAD-90-222
Format:
pdf
Media Type:
application/pdf
URL:
Help with citations