FEMA Mitigation Best Practices: Food Mitigation Project Protects Bidwell Paiute Tribal Reservation   [open pdf - 87KB]

Alternate Title: Food Mitigation Project Protects Bidwell Paiute Tribal Reservation

"Annually, the Bidwell Paiute Tribe experienced damage to their reservation from heavy storms. Their outdated dam and gutters were ill-equipped to handle the heavy amounts of rain. As a result, heavy runoffs caused serious erosion damage, especially to the earthen dam upstream from the community. The dam holds a water volume of 450,000 cubic feet and houses a hydroelectric system and generator. Damage often occurs to these systems from the rainfall. The effects of the erosion disrupt supply lines and access roads. The leadership of the Tribal Council applied for and received a grant from FEMA's Hazard Mitigation Grant Program to mitigate the problem areas. Phase I of the project was to place a concrete gutter along the southern portion of the Dam Road and eastern portion of Penstock Road (downstream) to carry storm runoff down a 24-inch culvert to Soldier Creek. In Phase II, the hydroelectric water supply pipe, which had collapsed into Soldier Creek, was buried further downstream. In addition, a timber-retaining wall was built with compacted stone behind it. The earthen ditches on the east and west sides of Dam Road were renovated with either concrete lining or corrugated metal pipes." This and other individual FEMA Best Practices documents are also combined in 'Mitigation Best Practices: Public and Private Sector Best Practice Stories for All Activity/Project Types in All States and Territories Relating to All Hazards [August 10, 2011],' which can be accessed at the following link: [https://www.hsdl.org/?abstract&did=683132]

Publisher:
Copyright:
Public Domain
Retrieved From:
Lessons Learned Information Sharing (LLIS)
Format:
pdf
Media Type:
application/pdf
URL:
Help with citations