ABSTRACT

Statewide Systems Implementation Experience from iFlorida Model Deployment   [open pdf - 209KB]

"The iFlorida Model Deployment, which was started in May 2003, called for the Florida Department of Transportation (FDOT) District 5 (D5) to complete the design, build, and integration of the infrastructure required to support operations in 2 years. The required infrastructure was extensive, spanned numerous stakeholders, and included many technologies that were new to FDOT D5, such as sophisticated traffic management center (TMC) operations software, a wireless network deployed along I­4, an interface to Florida Highway Patrol Computer Aided Dispatch (FHP CAD) data, statewide traffic monitoring, and many others. The iFlorida plans also called for deployment of these technologies in ways that required coordination among more than 20 stakeholders. It was an ambitious plan that would result in dramatically different traffic management operations for FDOT D5 and other transportation stakeholders in the Orlando area. In implementing the iFlorida plan, FDOT faced many challenges ranging from higher failure rates than expected for some field hardware to difficulties with the Condition Reporting System (CRS) and Central Florida Data Warehouse (CFDW) software. 'Despite these challenges, it can be readily claimed that the overall iFlorida Model Deployment was successful,' according to the final evaluation report for the iFlorida Model Deployment, published in January 2009. The difficulties associated with the iFlorida Model Deployment provided many opportunities to identify lessons learned from the experiences they had. The most important of these are presented below in a series of lessons learned articles."

Publisher:
Date:
2009-01
Copyright:
Public Domain
Retrieved From:
Lessons Learned Information Sharing (LLIS)
Format:
pdf
Media Type:
application/pdf
URL:
Help with citations