Better Planning and Oversight Could Have Reduced Construction Delays and Costs at the Kabul Military Training Center   [open pdf - 1MB]

"This report discusses the results of the Office of the Special Inspector General for Afghanistan Reconstruction's audit of U.S. Air Force Center for Engineering and the Environment (AFCEE) infrastructure projects at the Kabul Military Training Center (KMTC). The report includes four recommendations. These include two recommendations to the Commanding General, Combined Security Transition Command-Afghanistan (CSTC-A), to strengthen the planning process and two recommendations to the Director, AFCEE, to strengthen contract administration and to seek reimbursement from one of the contractors for the cost of electrical repairs related to poor performance by its Afghan subcontractors."

Report Number:
SIGAR [Special Inspector General for Afghanistan Reconstruction] Audit-12-2 Contractor Performance and Oversight / Kabul Military Training Center
Publisher:
Date:
2011-10-26
Copyright:
Public Domain
Retrieved From:
Defense Technical Information Center (DTIC): http://www.dtic.mil/
Format:
pdf
Media Type:
application/pdf
URL:
Help with citations